Municipal Administrative Building
Norridge, Illinois

Bringing A Project In Under Budget

Mr. Nkosi's first project with Warman Olsen Warman,
Architects was to redesign and produce the contract
documents for this 10,000 sq. ft. project in a 6 week
period.

 
Redesign was required because the original building
designed, before Mr. Nkosi's time with the firm, was
100% over budget.

 

wow norridge1wow norridge2
wow norridge3wow norridge4


Nkosi and the principal in charge of design came up
with a final solution that brought the project in below
the 1 million dollar budget.

We were able to provide a building that was functional
and under budget without sacrificing building space or
the quality of finish materials.